Quality Manual
Quality Document
Quality Procedure
- QP-CNS-1 Procedure for Communication Network Management System Maintenance
- QP-FCL-1 Procedure for Optical Fiber Lease, Bill Calculation And Prepare of Bill For Client
- QP-PSO-1 Procedure for Power System Operation & Control
- QP-RTS-1 Procedure for Research and Technical Services
- QP-SIS-1 Procedure for Surveillance Inspection of Sub-Station
- QP-SMD-1 Procedure for Telemetering Equipment Maintenance
- QP-SPM-1 Procedure for System Protection and Metering
- QP-SSM-1 Procedure for Sub-Station Maintenance
- QP-SSO-1 Procedure for Sub-Station Operation
- QP-TLM-1 Procedure for Transmission Line Maintenance
- QP-TRD-1 Procedure for Telecommunication & RTU Equipment Maintenance
- QP-CNP-1 Procedure for Control of Nonconforming Product
- QP-DCL-1 Procedure for Document Control
- QP-DCL-2 Procedure for Control of Quality Records
- QP-IQA-1 Procedure for Internal Quality Audit
- QP-MIS-1 Procedure for Management Information System
- QP-MNG-1 Procedure for Management Review
- QP-NCP-1 Procedure for Nonconformance , Corrective and Preventive Action
- QP-TQM-1 Procedure for Total Quality Management
Quality Work Instruction
- WI-PSO-01 Frequency & Voltage Control
- WI-PSO-02 Load Control (Load Shedding)
- WI-PSO-03 Outage Management
- WI-PSO-04 Preparation of Generation Schedule
- WI-PSO-05 Work Instruction for Tripping Management
- WI-PSO-06 Work Instruction for Power System Restoration from Grid Fail
- WI-PSO-07 Work Instruction for Natural GAS Requirement Planning
- WI-SSO-01 Work Instruction for Preparation of Wheeling Bill
- WI-TQM-01 Quality Control Circles
- WI-TQM-02 5-S Techniques